The previous conference room at location AVW 2328 was re-modeled and
re-furnished to bring in the state-of-the-art conference room
facilities. The ECE Tech Ops unit played a crucial role in designing and
constructing majority of the conference room. Below are some pictures
of the re-modeled conference room.
Projects >